Rosehill Rail Interlocking System At Brent Cross West Station

January 24, 2022

Rosehill Rail’s Interlocking System is a high-strength modular system which can be installed independent of sleeper spacing, making it the ideal solution for access roads as well as temporary and permanent RRAPs.
 
Following the construction of Brent Cross West Station, Brent Cross sidings now has capacity for up to 24 trains and features our innovative Interlocking System alongside our Rubber Edge Beams and Anti-Trespass Panels.
 
Rubber Edge Beams are installed in the same way as concrete alternatives, but unlike concrete they won’t crack, pit or spall due to freeze-thaw cycles, providing a long-lasting, low maintenance solution.
 
Available in standard 1.8 metre lengths, Rosehill Rail Rubber Edge Beams can be delivered efficiently and stacked without the problems associated with concrete. Used by rail networks across the world, they are ideal for use on both new installations and maintenance projects.

Subscribe to our Newsletter

Subscribe to our Newsletter

Join the Rosehill Rail mailing list to receive our latest news and updates.

You have Successfully Subscribed!