Exciting progress on Phase A of The Great Train eXpress (GTX) project in Seoul, South Korea. Rosehill Rail’s solid rubber Baseplate level crossings have been installed for Korea National Railway, providing reliable Road Rail Access Points (RRAPs) for staff and maintenance crews. These crossings ensure smooth operations while allowing trains to pass without disruption.
GTX is a high-speed rail initiative aimed at connecting key areas around Seoul, reducing congestion during peak times and enhancing transit efficiency.
Our Baseplate Level Crossing system is versatile, suitable for both temporary and permanent applications, and can be easily removed and reinstalled as needed. Made from recycled tyres, it’s a sustainable and cost-effective solution compared to traditional concrete alternatives.
Thanks to Ara Bridge, SG Rail and Ricardo Rail