The team at Premier Rail Services Limited have done a great job installing our Baseplated Crossing System at Associated British Ports in Hull, helping to speed up the transportation of turbine blades to wind farms around the country. This complex job involved several radius changes, with our solid rubber panels able to follow the curve of the track.
The Baseplated System is the ideal solution for occupational, RRAPS and TAPS, or light-use crossings, and individual panels can be rapidly removed for track inspections and maintenance. The cost-effective system can be made to suit narrow, standard or wide gauge and any rail or sleeper type.
Thanks to CR Reynolds Ltd for the photos.