Interlocking Crossing Installation At Ricksey Lane, Somerton.

July 7, 2022

It’s great to see one of our solid rubber Interlocking Crossings being installed as a 10.8m semi-permanent road rail access point (RRAP) at Ricksey Lane in Somerton.
 
The Interlocking RRAP is designed to be installed quickly and easily, independent of sleeper spacing, to reduce track possession times while delivering significant cost savings. It is sustainably manufactured in the UK from recycled tyre rubber and is the ideal solution for both temporary and permanent RRAPs.
 
Thanks to Mark Howells and the team at Network Rail.

Subscribe to our Newsletter

Subscribe to our Newsletter

Join the Rosehill Rail mailing list to receive our latest news and updates.

You have Successfully Subscribed!